From a single machine to a line: connect every process
Work back from the desired output
Define the end use and downstream requirements, then discuss pre-shearing, multi-stage shredding and separation. Equipment quantity and configuration depend on application review.
Plan for maintenance and spare parts
Include service access, knife replacement space, collection and transport routes in the layout. Discuss wear parts and spare-part preparation during planning.